Complete construction of all the required civil, mechanical, electrical and instrumentation works to expand the capacity of the topping and vacuum units at La Teja Refinery.
The work involved the disassembly of equipment and interconnections, the complete construction of new bases for the new equipment; the assembly of the new equipment, metallic structures (pumps,
exchangers, pressure vessels, metallic structures and so on —200 Ton) and piping (+ 20,000 inches of welding); electrical installation and related instrumentation; hydraulic tests and cleaning on new and intervened pipes; hydraulic tests on intervened containers, pumps and other equipment.
All work was performed following the strictest construction standards of the industry for being installations in classified areas, pipes under ASME and/or API standards, etc.
ANCAP – TOPPING AND VACUUM UNITS
Montevideo, Uruguay, 2016/2018
Areas of expertise:
industriesManufacturing Industry