From 2008 to 2010, Ingener carried out for ANP all the building and electromechanical upgrade and reforms of the existing Nº1 and Nº2 electrical distribution and transformation substations.
The contract covered the design, supply, civil works and electro-mechanical assembly of new 31.5 and 6.3kV equipment, mounting new 31.5 kV switchgears in substation N°2, moving the existing 31.5 kV switchgear set in the substations N°2 and Nº1, adding new switchgears to that set; power and control interconnection and commissioning of all equipments.
ELECTRICAL INFRASTRUCTURE – PORT OF MONTEVIDEO
Uruguay, 2008/2010
Areas of expertise:
Ports