In 2014, Cementos del Plata, a company of the corporate group ANCAP, which markets and distributes cement, clinker and other products made by its Portland Cement Division, contracted INGENER for the electrical installation and full instrumentation of its new lime manufacturing facility located at the department of Treinta y Tres.
The scope of supply included full 6.3/0.4 kV electrical installation for 8MVA installed capacity with more than 200 km of low and medium voltage lines, over 300 instrumentation loops and full execution of the cooling water system and fire suppression system for the plant.
For this project, Ingener also performed the complete installation of the fire prevention and water supply systems, including the prefabrication and on-site assembly of a 335 m 3 water storage tank intended for fire fighting, a pressurization system, a system of pipes for distribution —one aboveground of carbon steel type and another one underground, of HDPE—, a water supply and distribution system for drinking water, and a cooling water system with sprinklers.
CEMENTOS DEL PLATA – LIME PLANT
Treinta y tres, Uruguay, 2014/2015
Areas of expertise:
industriesManufacturing Industry