La Banderita wind farm, located near Gral Acha, province of La Pampa, Argentina, has eleven 3.6 MW wind turbines, totaling an installed power capacity of 40 MW.
The work carried out by Ingener included the execution of the BOP for the wind farm, under EPC modality. This involved the performance of the detailed engineering; civil works for the whole wind farm, including earthworks, wind turbines foundations and roadways; the complete electrical installation, including a 33 kV internal network and connection to the wind turbines. 33/132 kV step-up substation EPC, utility substation (132 kV) and connection to the transmission network.
LA BANDERITA WIND FARM – 40 MW
Gral Acha, province of La Pampa, 2017/2018