PUNTA DEL TIGRE THERMAL POWER PLANT (STAGES 1 AND 2) (300 MW)

San José, Uruguay, 2006/2007
Areas of expertise: EnergyEPCPower generationSubstations

UTE. Client: SANTOS CMI/General Electric

PUNTA DEL TIGRE THERMAL POWER PLANT (STAGES 1 AND 2) (300 MW)

Engineering, procurement and construction (EPC) for a 150 kV substation to connect six 50 MW GE turbines. Medium and low voltage BOP. Detailed engineering, provision of equipments, civil works, electro-mechanical assembly, commissioning.