Construction of a new 500 kV transmission station in switch and a half configuration (seven switches), including the supply and assembly of 15 500 kV single-phase reactors.
The scope of the work includes executive engineering, the purchase of supplies, the construction of the Cardal Station, the opening of the PA5(Palmar)-MA5(Montevideo) line and its connection to the new station, as well as interventions at the end stations in terms of protection and communications.